I had Aaron and Silverback Electric do a job for me about 4 years ago for which he did a 10/10 job on. I didn't hesitate calling Aaron to get a 100 amp sub panel brought into my garage for power tools (wood working) and eventually a level 2 electric vehicle fast charger. He made sure he had all the materials (#2 wire, panel, new outlets, breakers) when he showed up to get the job done and as usual everything was a neat and tidy when completed. What I like about Aaron is he fits in the small jobs and doesn't charge you an arm and a leg like some of the other outfits do. Super easy going personality and explains everything in easy to understand terms. Thanks again Silverback for a job well done!
- Approximate cost of services:
- $800.00
- Company Response
Hi Michael
Happy to hear you're enjoying your new sub panel it's going to make your life a lot easier.
I think that's the way to go. Get all prepped up for a new electric car it's the way of the future.See you on the next one.
thanks Aaron