The first contractor left his assistant to do the tiling and soldering. The bottom of the tub, under the taps he soldered, was melted. The tiling on the floor was crooked. Rona inspected the work when we asked. These contractors were fired. The second contractor redid the floor but left black burn marks on the toilet when he used a power cutter tool to cut the bolts on the bottom of the toilet. Sloppy work all around. No pride in workmanship. No customer satisfaction.
- Approximate cost of services:
- $8,000.00
1 of 1 people found this review helpful.
Was this review helpful?