Interlock Driveway, side walkway and front landing
Fantastic job! Very pleased with the final results! Met with Mike and explained to him about our problem with unlevel driveway and front landing causing kids to slip and slide in the winter time. Mike suggested to add a new step that would help level the surfaces. He came back a couple of days after with his design to beautify the front landing area as well as level the surfaces. After we signed the contract, the excavation crew took about 3 days to finish excavating and compacting the gravels for the foundation. Then we met Sterlin who was the lead person for the installation of interlocking stones. This man worked hard and really knew his stuff. He also did some extra work at our request, free of charge!! The crew was well equipped with all necessary machines to complete the job. Bunch of great guys. Thanks for doing a fantastic job, our new driveway and front have turned many heads as a result :-)
- Approximate cost of services:
- $34,000.00
- Company Response
We appreciate your kind review, It was a pleasure working with you as well, we are very pleased how your project turned out, Thank you Jim for choosing Synergy Contracting inc. and sharing your experiences.
Michael Miguel
Design Consultant and Project Manager
Mobile - 647-856-5621
SYNERGY CONTRACTING INC.