Installing floor drain with back flow preventer
Installation of brand new cartridge
Client had a complaint about water not going through catch basin. We solved it.
We do plumbing as well not only drains.
The previous Contracter left the job a mess for whatever disagreement they had. We went took over the second dig is our dig pretty small but we did our work for out of there in 2 days vs the Contracter who was there for 2 weeks he couldn’t finish it.
Basement new line in installation with a clean out access for future cleaning.
Installing a backflow water valve house basement
Clean out installation on apartment building behind kitchen cabinet
Brand new 4” PVC underground basement house.
Basement clean out installation.
30 Ft / 3 Floor cast iron pipe change APPX 10’ each line. Behind the kitchen cabinets.