Demolition in Drive, ON

Demolition at any scale can get very messy - if it is done incorrectly, it could cause damage and affect the structure of the house. An entire house typically takes around 3 days to be fully demolished and an extra 1-2 days for post clean up.

Recommended Pros in Drive, ON

Recently Reviewed Drive Demolition

Published: 12/18/2019
I had to convert my basement into a self-contained apartment including a below grade entry, full kitchen, and ceiling insulation. Jose gave me a quote on the spot, the lowest among three that I obtained, and he began and...
Published: 12/13/2019
Manpower were very quick, clean and professional. Arrived everyday with a full crew. They set up an air filter system to protect HVAC systems. All and all a great job.
Published: 12/11/2019
Fernando responded to my request to quote immediately and was able to start the job within 2 weeks. We used three 40 yard bins and his crew was able to complete the job in 5 days. Upon completion...