Office staff and estimator were very professional, the workers were not. They were paid to remove my basement ceiling drywall and the paper asbestos which was covering 7 duct work lines. The estimator promised he would set up a negative presure system. while the foreman who showed up scoffed and said "yah, he will promise just about anything". I insisted and he returned with the required equipment starting the job 2 hours late. After clean up was finished, and the workers had all left I noticed 4 pieces of asbestos that they had failed to be removed. The workers did came back when called to remove the remaining asbestos, but fewer precautions were taken this time with no plastic walls or vacume system used. The following link is a quick and blurry video taken of the asbestos they missed the first time. http://youtu.be/QWC_v-Gs8Zc
- Approximate cost of services:
- $2,000.00